The Boeing Co., St. Louis, Missouri, is awarded a cost-plus-incentive-fee $36,000,000 modification (P00063) to a previously awarded fixed-price incentive (firm-target), cost-plus-incentive-fee contract (N0001918C1012). This modification adds scope to provide non-recurring engineering for the preliminary design review of six sub-systems to mitigate component obsolescence in support of MQ-25 Stingray low-rate initial production for the Navy. Work […]
Search
Quads Text
-
Recent Posts
- Ten Data-Backed Truths Of User Experience ROI May 15, 2026
- Pyrefly LSP Integration with Type Engine in PyCharm 2026.1.2 May 15, 2026
- IntelliJ IDEA 2026.1.2 Is Out! May 15, 2026
- A New Default Project Structure for Kotlin Multiplatform May 15, 2026
- Help Shape the Future of Kotlin in the Age of AI May 15, 2026
Archives
Meta
